Bell's Cathedrals: Chichester (1901) - A Short History & Description Of Its Fabric With An Account Of The - Diocese And See by Hubert C. Corlette
page 25 of 130 (19%)
page 25 of 130 (19%)
|
the building, which were Sir Gilbert Scott's principal authority upon
which to base his restoration of this portion of the tower, were made from work which had already been once rebuilt. But why was this part of the church rebuilt, and by whom? Two alternative suggestions for the reason have been offered. [5] Walcott, p. 15. [6] Author of "Architectural Parallels." Evidently, if the upper part of the tower did not fall, it is apparently certain that it was reconstructed, in order to carry the additional weight of the larger tower. But in examining the documentary evidence offered us, we find some further help. The teaching of archaeology shows that the portion of this tower above the main supporting arches and up to the bottom of the parapet was executed between 1225 and 1325--that is, it was finished not very long after the new part of the south-west tower was completed. The cathedral statutes show that between the years 1244-1247 Bishop Ralph Neville was much concerned about a "stone tower" which he wished to see completed. They tell us, too, that the same bishop had himself expended one hundred and thirty marks upon the fabric, [7] and that his executors, besides releasing a debt of £60 due to him and spent on the bell-tower, gave £140 to the fabric of the church. Ralph died in 1244, so it is concluded that the work in which he was so interested was none other than the central or bell-tower of the cathedral, and that the earlier tower, with its supporting arches, must have fallen, else it is not likely that the work would have been rebuilt from below the spring of these arches before the new superstructure could be added; for we are obliged to take the customs of mediæval builders into |
|