Book-bot.com - read famous books online for free

How to Observe in Archaeology by Various
page 18 of 132 (13%)
again. Sketch a plan, always north up in the book, note bearing of
main wall, and then measure with bamboo rod all original dimensions,
with some diagonals to fix angles; do not forget the thickness of the
walls. It is best for a long length to stretch a tape, pegged down by
the ring, and pulled tight by hand: read off all positions of doors,
windows, cross-walls, &c., on one long length, and not as separate
short lengths. If possible plot the measures on squared paper as you
go, and then any errors or omissions will be checked at once. 'E. and
O.E.' has no place in a plan.

Town mounds.
Estimate height over bare land outside; eye height is a trifle over
five feet. At the foot of the mound see where the horizon cuts the
shoulder of it to find eye height; walk up to that point, and sight
another five feet; so on, till you see over the top. If there is any
section, by a stream side, or digging, or land-slip, look for strata,
stone or brick walls and floor levels, and for any distinctive
potsherds; observing levels as before. Look all over the top for
potsherds, to find the latest period of the town. Look around the
mound for any early potsherds. Sherds on the slopes are worth less;
as they have probably slipped down. Red burnt brick in Egypt is all
Roman or Arab; in Greece and Asia Minor, red brick and mortar is
Roman, Byzantine, or later.

Walk to the middle of the site or mound, and see its extent. Then
walk round the wall line, or circuit of it, pacing and compass
noting, to sketch the shape and size of the site: especially look for
any straight lines of wall showing. Sometimes a mud-brick wall may be
entirely denuded away, yet the position is shown by the sharp edge of
the strew of potsherds on the surface.
DigitalOcean Referral Badge