Scientific American Supplement, No. 508, September 26, 1885 by Various
page 17 of 137 (12%)
page 17 of 137 (12%)
|
The Sutro drain tunnel (nearly four miles in length) connects with the shaft at a depth of 1,600 ft., up to which point all the water encountered below is pumped. The shaft was sunk to the depth of 2,200 ft. before more water was encountered than could be hoisted out in the "skips" with the dirt. At the 2,200 level two Cornish pumps, each with columns fifteen inches in diameter, were put in. At the 2,400 level the same pumps were used. On this level a drift was run that connected with the old Hale & Norcross and Savage shafts, producing a good circulation of air both in the shaft and in the mines mentioned. At this point, on account of the inflow from the mines consequent upon connecting with them by means of the drift, they had more water than the Cornish pumps could handle, and introduced the hydraulic pumps, which pumps are run by the pressure of water from the surface through a pipe running down from the top of the shaft, whereas the Cornish pumps are run by huge steam engines. By means of the hydraulic pumps they were enabled to sink the shaft to the 2,600 level, and extended the Cornish pumps to that point, where another set of hydraulic pumps was put in. They then sunk the shaft to the 2,800 level, when they ran another drift westward, and tapped the vein. The prospects at this depth in the Hale & Norcross and Chollar mines were so encouraging that the management decided to sink the shaft to the depth of 3,000 ft. On reaching the 3,000 level, they ran a third drift through to the vein. The distance from the shaft to the east wall of the vein was found to be only 250 ft. At the depth of 3,000 ft. they put in one of the pair of hydraulic pumps that is to be set up there. The second pump is now arriving from San Francisco, and as soon as the several parts are on the ground, it will be at once put in place alongside its fellow on the 3,000 level. This additional pump |
|