An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken - Prepared By Federal Emergency Management Agency by Various
page 15 of 83 (18%)
page 15 of 83 (18%)
|
for the San Francisco Bay area. Annex 2 gives an overview of this
draft plan. This is a site-specific plan for response to potential catastrophic earthquake occurrences. The emergency response portion relies upon a decentralized approach which provides for Federal disaster support activities to be assigned to selected Federal agencies by mission assignment letters. No specific plans have been prepared in this detail for other seismic risk areas, although it is expected that the Bay Area plan could be easily adapted to other areas. The Department of Defense and the Department of Transportation are developing detailed earthquake plans that would ensure a well-organized and adequate response to mission assignments for a major earthquake. The plans of other agencies need further development. Very significant capabilities to assist in emergency response exist within the California National Guard, California Highway Patrol, the Departments of Health Services and Transportation, and the U.S. Department of Defense. Capabilities exist for such lifesaving activities as _aerial reconnaissance, search and rescue, emergency medical services, emergency construction and repair, communications, and emergency housing and food_. Current estimates by both Federal and State officials, however, indicate that at least 6 to 8 hours would be required before personnel and equipment can be mobilized and begin initial deployment to the affected area. During the period before the arrival of significant outside assistance critical to the saving of lives (especially of those trapped in collapsed buildings), the public would be forced to rely largely upon its own resources for search and rescue, first aid, and general lifesaving actions. The current level of public preparation for this critical phase of response can be described as only minimal. Much of the current state of preparedness |
|