An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken - Prepared By Federal Emergency Management Agency by Various
page 43 of 83 (51%)
page 43 of 83 (51%)
![]() | ![]() |
|
event, however, will severely tax existing resources and provide a
major test of management relationship among different governmental jurisdictions and levels. For a catastrophic earthquake, current plans and preparedness are clearly inadequate, leading to a high likelihood that Federal, State, and local response activities would become disorganized and largely fail to perform effectively for an extended period of time. B. STATE AND LOCAL RESPONSE Although there are widely differing approaches, local emergency planning in California generally consists of a basic plan and a series of contingency plans. The basic plan establishes the authority, sets forth references, addresses hazard vulnerability, states the planning assumptions, establishes an emergency services organization, assigns tasks, formulates a mutual aid system, and directs the development of specific support annexes. For those hazards identified in the basic plan, a separate contingency plan is then developed to address the unique nature of the hazardous event. The contingency plan contains service support plans for each of the functional operations, including detailed standard operating procedures. The planning efforts of local jurisdictions are coordinated with adjacent jurisdictions and the California OES for consistency. A plan is not considered complete without the support annexes which make the plan operational. The survey undertaken for this assessment disclosed that approximately 93 percent of the jurisdictions examined have existing, basic plans; 50 percent have completed annexes; 28 percent of the basic plans addressed an earthquake hazard |
|