An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken - Prepared By Federal Emergency Management Agency by Various
page 63 of 83 (75%)
page 63 of 83 (75%)
![]() | ![]() |
|
compendium of information and resources needed to cope with
emergencies (see (7) in figures 1 and 2). This includes references describing the control structure (Emergency Operations Center locations, communications, key facilities, personnel lists, and equipment source listings). C. FEDERAL EARTHQUAKE RESPONSE PLANNING Most Federal agencies operating within the State have a generic emergency response plan that establishes their internal procedures for responding to disasters. Certain agencies such as the Corps of Engineers and the Federal Highway Administration, which provide services and support that are used on a regular and fairly extensive basis in disaster, tend to have more highly developed disaster response plans. Some of them even have rather basic earthquake response segments included in their basic plans. Thus, for moderate earthquakes these plans are relatively effective and the Federal response can be expected to be at least adequate. Few Federal agencies, however, have developed any specific plan that is adequate to respond to the demands of a catastrophic event causing property damage exceeding the $2 billion range. Of 24 Federal agencies whose earthquake planning status were recently evaluated by FEMA Region IX, only the Sixth U.S. Army was determined to have developed a comprehensive capability that is in acceptable detail, has been exercised, and appears to be operationally adequate and reliable. Other Federal agencies are now beginning to perceive the need to improve their planning and response capability following the expected event, and are gradually responding to this need. |
|