"4. The end of the bloom formed from the top of the ingot shall be
sheared until the entire face shows sound metal. "All metal from the top of the ingot, whether made from the bloom or the rail, is the top discard. [Sidenote: Shrink] "5. The number of passes and speed of train shall be so regulated that, on leaving the rolls at the final pass, the temperature of the rails will not exceed that which requires a shrinkage allowance at the hot saws, for a 33-ft. rail of 100 lb. section, of 6-1/2 in. for thick base sections and 6-3/4 in. for A. S. CC. E. sections, and 1/8 in. less for each ten pounds decrease of section, these allowances to be decreased at the rate of 1-100 in. for each second of time elapsed between the rail leaving the finishing rolls and being sawed. "The bars shall not be held for the purpose of reducing their temperature, nor shall any artificial means of cooling them be used between the leading and finishing passes, nor after they leave the finishing pass. [Sidenote: Section] "6. The section of rail shall conform as accurately as possible to the templet furnished by the Railroad Company. A variation in height of 1-64 in. less or 1-32 in. greater than the specified height, and 1-16 in. in width of flange, will be permitted; but no variations shall be allowed in the dimensions affecting the fit of splice bars. |
|