Canada and the States by E. W. (Edward William) Watkin
page 46 of 473 (09%)
page 46 of 473 (09%)
![]() | ![]() |
|
for these purposes of working and repair and renewal.
"The country for three or four hundred miles from Winnipeg west is more or less settled; in some parts farms are quite numerous, and the land good and well cultivated. At Portage la Prairie the Manitoba and North- Western Line leaves the Canadian Pacific. It is being rapidly pushed forward, and 120 miles of it have already been completed through the 'Fertile belt.' It should have been mentioned that the line between Port Arthur and Winnipeg, a length of 430 miles, was constructed by the Government of Canada and given to the Canadian Pacific Railway Company free as a portion of their system. This part of the line is laid with 57 lbs. steel rails, and is well ballasted. The line is also ballasted east of Port Arthur, though in some places the ballast is of poor quality, and in others there is not sufficient of it. West of Winnipeg, however, there is no ballast across the prairie, except where the excavations through which the line goes afford ballast, it being simply surfaced up from side ditches with whatever the material may happen to be; but it is in good condition for a line of such a character, and the schedule time is 24 miles an hour, including stoppages. "The train ran through Qu'Appelle, Regina, and Moose Jaw during the night of the 18th, and reached Dunmore (650 miles from Winnipeg) at 15.30 o'clock on the 19th. At this point there is a branch, 3-feet gauge line, 110 miles in length, to the Lethbridge mines, belonging to Sir Alexander Galt & Company. His son, Mr. Galt, met us at Dunmore, and invited us to go and inspect the mines, but as it would have made a delay of at least one day, the idea had regretfully to be abandoned. The train reached Bassano (750 miles from Winnipeg) at 19 o'clock, our time, having made up 3 hours and 20 minutes since leaving Winnipeg, which was the time late leaving there. The train was then exactly 97 |
|