The Sewerage of Sea Coast Towns by Henry C. Adams
page 95 of 154 (61%)
page 95 of 154 (61%)
|
Piles similar to Fig. 31 can only be fixed in sand, as was the case at Waterloo, because they must be absolutely true to line and level, otherwise the pipes cannot be laid in the cradles. The method of fixing these piles is described by Mr. Ben Howarth (Minutes of Proceedings of Inst.C.E., Vol. CLXXV.) as follows:--"The pile was slung vertically into position from a four-legged derrick, two legs of which were on each side of the trench; a small winch attached to one pair of the legs lifted and lowered the pile, through a block and tackle. When the pile was ready to be sunk, a 2 in iron pipe was let down the centre, and coupled to a force-pump by means of a hose; a jet of water was then forced down this pipe, driving the sand and silt away from below the pile. The pile was then rotated backwards and forwards about a quarter of a turn, by men pulling on the arms; the pile, of course, sank by its own weight, the water-jet driving the sand up through the hollow centre and into the trench, and it was always kept vertical by the sling from the derrick. As soon as the pile was down to its final level the ground was filled in round the arms, and in this running sand the pile became perfectly fast and immovable a few minutes after the sinking was completed. The whole process, from the first slinging of the pile to the final setting, did not take more than 20 or 25 minutes." [Illustration: PLATE V. ROCK BED. Fig. 26--ABERDEEN SEA OUTFALL. Fig. 27--SMALL GREAT CROSBY SEA OUTFALL. Fig. 29--CAST IRON PIPE ON STEEL CAST AND BEARERS. Fig. 31--WATERLOO (LIVERPOOL) SEA OUTFALL.] |
|