Scientific American Supplement, No. 384, May 12, 1883 by Various
page 17 of 136 (12%)
page 17 of 136 (12%)
|
sheeted all over with tamarack 10 in. thick and the crest covered with
1/2 in. boiler plate 3 ft. wide. The whole structure was carefully filled with stone--field stone, or "hard head" generally being used for the purpose. At this stage of the works, namely, in the fall of 1881 the structure presented somewhat the appearance of a bridge with short spans. The whole river--fortunately low--flowed through the sluices of which there were 113 and also through a bulkhead which had been left alongside of the slide with a water width of 60 ft. These openings had a total sectional area of 4,400 sq. ft., and barely allowed the river to pass, although, of course, somewhat assisted by leakage. [Illustration: Fig. 1. CROSS SECTION IN DEEP WATER.] It now only remained, to complete the dam, to close the openings. This was done in a manner that can be readily understood by reference to the cuts. Gates had been constructed with timber 10 in. thick, bolted together. They were hung on strong wooden hinges and, before being closed, laid back on the face of dam as shown at B, Figs. 1, 2, and 3. They were all closed in a short time on the afternoon of 9th November, 1881. To do this it was simply necessary to turn them over, when the strong current through the sluices carried them into their places, as shown at A, Figs. 2 and 3 and by the dotted lines on Fig. 1. The closing was a delicate as well as dangerous operation, but was as successfully done as could be expected. No accident happened further than the displacement of two or three of the gates. The openings thus left were afterward filled up with timber and brushwood. The large opening alongside of the slide was filled up by a crib built above and floated into place. |
|