The Water Supply of the El Paso and Southwestern Railway from Carrizozo to Santa Rosa, N. Mex. - American Society of Civil Engineers: Transactions, No. 1170 by J. L. Campbell
page 22 of 38 (57%)
page 22 of 38 (57%)
![]() | ![]() |
|
There is an open stand-pipe where the two pipes and grades join.
When this section of the line was laid, the last car of 16-in. pipe was late in arriving and, as it was desirable to get water into the reservoir as soon as possible, 500 ft. of 10-in. pipe were laid in the lower part of the 16-in. line, near the reservoir, as indicated on Fig. 2, which shows the hydraulic grades and the pipe diameters of this section of the line. When the first two velocity measurements, of March 10th and 31st, 1908, described below, were made (after the line had been put into service on February 20th, 1908), the 500 ft. of 10-in. pipe were still in the 16-in. line, and the hydraulic grade was defined by the solid line, _ABCDE_, Fig. 2. When the third measurement, of May 12th, 1909, also described below, was made, the 10-in. pipe had been replaced by 16-in. pipe, and the hydraulic grade was defined by the solid line, _ABE_. [Illustration: FIG. 2.] The dotted line, _AFE_, is the approximate theoretical position which the grade, _ABCDE_, should have assumed when the 500 ft. of 10-in. pipe were taken out of the 16-in. line. On the contrary, it took the position of the grade line, _ABE_. During the interval between March, 1908, and May, 1909, the water came to overflow from the stand-pipe at _B_, when the line was running under |
|