Shop Management by Frederick Winslow Taylor
page 86 of 159 (54%)
page 86 of 159 (54%)
![]() | ![]() |
|
(c) TIME STUDY FOR ALL OPERATIONS DONE BY THE VARIOUS MACHINES. This information is best obtained from slide rules, one of which is made for each machine tool or class of machine tools throughout the works; one, for instance, for small lathes of the same type, one for planers of same type, etc. These slide rules show the best way to machine each piece and enable detailed directions to be given the workman as to how many cuts to take, where to start each cut, both for roughing out work and finishing it, the depth of the cut, the best feed and speed, and the exact time required to do each operation. The information obtained through function (b), together with that obtained through (c) afford the basis for fixing the proper piece rate, differential rate or the bonus to be paid, according to the system employed. (d) THE BALANCE OF ALL MATERIALS, RAW MATERIALS, STORES AND FINISHED PARTS, AND THE NUMBER OF DAYS' WORK AHEAD FOR EACH CLASS OF MACHINES AND WORKMEN. Returns showing all receipts, as well as the issue of all raw materials, stores, partly finished work, and completed parts and machines, repair parts, etc., daily pass through the balance clerk, and each item of which there have been issues or receipts, or which has been appropriated to the use of a machine about to be manufactured, is daily balanced. Thus the balance clerk can see that the required stocks of materials are kept on hand by notifying at once the purchasing agent or other proper party when the amount on hand falls below the prescribed figure. The balance clerk should also keep a complete running balance of the hours |
|