Book-bot.com - read famous books online for free

Shop Management by Frederick Winslow Taylor
page 85 of 159 (53%)
(q) Improvement of system or plant.

These several functions may be described more in detail as follows:

(a) THE COMPLETE ANALYSIS OF ALL ORDERS FOR MACHINES OR WORK TAKEN BY
THE COMPANY.

This analysis should indicate the designing and drafting required, the
machines or parts to be purchased and all data needed by the purchasing
agent, and as soon as the necessary drawings and information come from
the drafting room the lists of patterns, castings and forgings to be
made, together with all instructions for making them, including general
and detail drawing, piece number, the mnemonic symbol belonging to each
piece (as referred to under (h) below) a complete analysis of the
successive operations to be done on each piece, and the exact route
which each piece is to travel from place to place in the works.

(b) TIME STUDY FOR ALL WORK DONE BY HAND THROUGHOUT THE WORKS, INCLUDING
THAT DONE IN SETTING THE WORK IN MACHINES, AND ALL BENCH AND VISE WORK,
AND TRANSPORTATION, ETC.

This information for each particular operation should be obtained by
summing up the various unit times of which it consists. To do this, of
course, requires the men performing this function to keep continually
posted as to the best methods and appliances to use, and also to
frequently consult with and receive advice from the executive gang
bosses who carry out this work in the shop, and from the man in the
department of standards and maintenance of plant (j) beneath. The actual
study of unit times, of course, forms the greater part of the work of
this section of the planning room.
DigitalOcean Referral Badge